Assemblists
Book a Consultation
AI Consultancy & Development · Singapore

AI systems built around your business

We train your team, we redesign the workflow, and we build & secure the system that runs it.

01

What we do

Three pillars

Most businesses do not need more AI tools. They need trained people, processes worth automating, and someone to build the thing.

01

Training & Courses

Courses and hands-on workshops that get your team using AI properly — real tooling, real work, and where not to trust it. How the training works.

02

Consulting & Workflow

We map how your business actually runs, find the work worth automating, and give you a costed roadmap.

03

Build & Deployment

We build, ship, and secure the system. We build with AI, which is why it lands in weeks and on budget. Just like any other deployment, it goes through rigourous penetration testing.

02

Work

Selected examples

Systems we have designed, built and run in daily use. Each one started as a process that was taking too long, or an itch that was never scratched.

  • Video Review Portal interface
    Media

    Video Review Portal

    A private library for finished work. Clients watch, comment and approve without a public link.

  • Meeting Notetaker interface
    Meetings

    Meeting Notetaker

    A bot joins the call, transcribes who said what, and files the actions automatically.

  • Image Generation interface
    Creative

    Image Generation

    On-brand images generated and edited from a chat box, on hardware you control.

  • Project Scheduling interface
    Planning

    Project Scheduling

    Every project and deadline on one timeline. Drag a bar and the source updates.

  • Leave Management interface
    People

    Leave Management

    A multi-step approval reduced to one form, routed to the right approver, decided in chat.

  • Feedback Triage interface
    Product

    Feedback Triage

    Scattered feedback sorted, classified and prioritised into a board the team can work from.

  • Event Photo Booth interface
    Events

    Event Photo Booth

    A branded capture station. Guests shoot, restyle and send to their phone in seconds.

  • Knowledge Kiosk interface
    Retail

    Knowledge Kiosk

    A voice assistant that answers from your own material, for showrooms and lobbies.

03

How we work

Four phases
01

Understand

We learn the process, the tools, and where the time actually goes.

02

Design

We define the architecture, the workflow, and the roadmap.

03

Build

We develop, integrate, test, and deploy into your operations.

04

Improve

We measure, gather feedback, and refine as the business changes.

04

Why Assemblists

Three reasons

Most consultancies hand you a deck. Most vendors hand you their product. We assess, design, and build.

Business-first

Problem before technology

We start with the operational problem, not the tool. Sometimes the answer is a model; often it is a better process, and occasionally it is nothing at all. We will tell you which.

End-to-end

Strategy through delivery

The same team that assesses the process trains your people and builds the system. No slide deck, no handover to a third party, no gap between the plan and the thing that runs.

Independent

No vendor allegiance

We do not resell anyone’s platform. Model, host and stack are chosen per project on privacy, cost and fit — and swapped when something better comes along.

05

Who you work with

Operators

We have run companies since 2013, not just projects — payroll, pipelines, utilisation and margin, and the awkward conversation when a delivery date slips. That is the side of the table we are used to sitting on, which is usually the fastest way to get to what actually needs fixing.

Davier Yoon

Davier Yoon

Co-founded a creative technology studio in 2013 and has run it since. Directs productions at national scale, where the constraint is almost never the idea and almost always the schedule, the vendors and the sign-offs.

Joshua Tan

Joshua Tan

Co-founded a creative technology studio in 2013. Thirteen years of taking commercial work from pitch to delivery for clients including Facebook, Nike, MINDEF and Samsung, on fixed budgets and immovable dates.

Leon Lim

Leon Lim

Builds the systems and owns the technical architecture — platforms, integrations and the infrastructure underneath, not just the interface. Has delivered into live operations for Changi Airport Group, the National Museum of Singapore, NEC, Kingsmen and Pico.

Isaac Tan

Isaac Tan

Investor and operator. Has built, funded and wound down media businesses, and sits closest to the numbers — strategy, finance, and what a business case has to clear before it is worth doing at all.

06

FAQ

Common questions

Do you work with businesses in Singapore?

Yes — SMEs, agencies and growing companies here and across the region. Engagements run remotely, with in-person sessions for discovery and training.

Can this be supported by Singapore government grants?

Schemes such as the Enterprise Development Grant (EDG) and Productivity Solutions Grant (PSG) can apply to digitalisation and automation work. We scope and document projects so they can be put forward. More on EDG and PSG.

Where is our data stored, and how does this sit with the PDPA?

Architecture follows the sensitivity of the data — regional hosting, private cloud, or fully self-hosted. Permissions, retention and human review are designed in from the start. More on AI and the PDPA.

How long does a project take, and what does it cost?

A focused assessment or a single automation runs in weeks; a full platform is phased. Both are quoted only after we have defined the problem.

Do we need to know what we want built?

No. Most engagements start from a business problem, not a specification.

07

Start with the business problem

Get started

You do not need to know which tool you need. Tell us what is taking too long or costing too much.

Response timeWe read every enquiry ourselves and reply within two working days.

Or emailhello@assemblists.ai

StudioGeneral Magnetics Building
625 Lorong 4 Toa Payoh #04-01
Singapore 319519
+65 6909 6089

Required

Required

Enter a valid email address

Required

Required

By submitting, you agree that Assemblists may contact you about your enquiry.

Thank you

Your enquiry has been received. We will be in touch.

Ready to start small?

One workflow, one pilot. Prove the case, then expand.